Past and Present FAA Grant Documents

Past and Present FAA Grant Documents

RHV, E16 & PAO

Airport

FAA Project Description

FAA Grant Number

Grant Amount

FAA Participation Percentage

Applicant Date

Award Date

BOS Action Date

RHV

The FAA has extracted grant assurances for individual grants and created this new document Terms and Conditions of Accepting Airport Improvement Program Grants. This document will only be updated when a change to the terms occurs and it will no longer be necessary to submit it with each grant.

RHVPlanning for pavement management3-06-0225-14

$50,350

95%

08-15-2011, X
07-01-2011, X
09-12-201105-10-2011 a, s, F85
RHVNoise Mitigation Measures for Residences within 65-69 DNL3-06-0225-13

$450,000

95%

06-23-200606-20-200706-19-2007
RHVInstall perimeter Fencing and Gates - Phase 23-06-0225-12

$551,300

95%

04-27-200708-20-200704-10-2001
RHVInstall Noise Monitoring System3-06-0225-11

$ 1,200,000

95%

06-23-200606-16-200604-29-2003 ,S
RHVSigning and marking modifications: rehabilitate apron, phase 23-06-0225-10

$435,000

95%

04-14-200507-05-200503-22-2005
RHVAcquire security enhancements (perimeter fence, gates and access control)3-06-0225-09

$ 554,500

95 %

06-23-200308-11-2003

04-29-2003

RHVImprove airport drainage (hangar taxilane and apron areas), phase II; rehabilitate apron (approx. 144,000 s.f.); rehabilitate road access (approx. 60,000 s.f.); install perimeter fencing and gate; install navaids (wind indicator, segmented circle, beacon tower); rehabilitate Runway 13L-31R REIL and pilot controlled lighting3-06-0225-08

$774,100

90%

04-11-200209-18-200204-10-2001
03-22-2005​
07-17-2006​
RHVApron/taxiway drainage improvements, apron rehab, access road rehab, security fence and gates, wind indicators and segmented circle, REIL, PCL, beacon tower and electrical service rehab.3-06-0225-07

$180,000

90%

04-11-200108-15-200104-10-2001
RHVConduct Master Plan Study3-06-0225-06

$280,000

90%

09-14-1999
05-23-2000
09-22-2000
09-27-1999
09-19-2000
RHVFAR Part 150 Airport Noise Compatibility Planning Study3-06-0225-05

$168,000

90%

04-17-199708-10-199809-29-1998
RHVRunway/taxiway rehabilitation, apron rehabilitation, lighted airfield signs, drainage, and reconstruction of perimeter access road.3-06-0225-04

$1,748,250

90%

08-20-199809-03-199809-29-1998
RHVRunway/Taxiway rehab - Originally to create/add tiedowns3-06-0225-03

$539,863

90%

08-15-198809-07-198808-03-1988
RHVExpand aircraft tiedown apron including drainage, fence, tiedowns, lighting/markings3-06-0225-02

$900,000

90%

04-08-198405-14-1984
10-06-1985
04-20-1984
03-08-1984
06-26-1984
07-08-1996
RHVLand acquisition/airport development (5.1 acres)8-06-0225-01

$22, 145

53.72%

04-13-197106-08-197106-22-1971
RHVInstall apron floodlighting; construct apron extension (approx. 100,000 sq. ft) including tie-downs; construct apron edge taxiway extension (30 ft. x 400 ft.)9-04-128-C907

$30,145

53.62%

10-21-196801-21-196909-10-1969
RHVInstallation of MI Taxiway Lighting System and Ducts9-04-128-D906

$12,000

53.63%

04-08-196807-03-196807-19-1968
RHVConstruction of aircraft parking apron including tie-downs (approximately 150,000 s.f.); relocation of remote control panel from vault to control tower; lighting of ramp parking area.9-04-128-D805

$37,215

53.63%

05-01-1967
07-24-1967
10-19-196704-21-1967
06-09-1967
06-23-1966
RHVConstruct Apron with tiedowns and a drainage system on the same side of the airport.9-04-128-D604

$78,708

53.64%

04-23-196606-21-1966 
RHVLand Acquisition Parcels 03-1/-3-2, clear/drain site, runway/taxiway construction, apron, fence, waterline9-04-128-D503

$346.570

53.96%

03-09-196410-26-196409-13-1965
RHVLand Acquisition Parcels 1, 2 & 39-04-125-D201

$363,285

53.89 %

05-23-196310-26-196206-25-1962
RHVLand Acquisition Parcels 1, 2 & 4, relocate Cunningham Ave9-04-125-D402

$398,010

53.89 %

03-12-196309-14-1963

10-17-1963

        
 

Airport

FAA Project Description

FAA Grant Number

Grant Amount

FAA
Participation Percentage

Applicant Date

Award Date

BOS Action Date

E16The FAA has extracted grant assurances for individual grants and created this new document Terms and Conditions of Accepting Airport Improvement Program Grants. This document will only be updated when a change to the terms occurs and it will no longer be necessary to submit it with each grant.
E16Planning Grant - Pavement Management3-06-0229-09

$52,250

95%

08-15-2011, X
07-01-2011, X
09-12-201105-10-2011 a, s
E16Prepare and Environmental Assessment (This grant was returned to the FAA due to inability of AEF to fund CEQA requirements)3-06-0229-08

$400,000

95%

 06-17-200803-22-2005
E16Install Miscellaneous NAVAIDS, Install Perimeter Fencing3-06-0229-07

$554,000

95%

1 2 308-13-200703-22-2005
E16Remove obstruction for approach protection3-06-0229-06

$ 150,000

95%

04-14-2005

06-14-2005

03-22-2005
E16Acquire security enhancement (perimeter fence, gates and access controls); Install AWOS IIIP3-06-0229-05

$529,000

95%

06-23-200308-12-200304-29-2003
E16Install Fire Water Line Extension (approx. 2,000 lf); Construct Access Road (approx 20' x 1,100') and security access control gate (2 ea), Phase 13-06-0229-04

$300,000

95%

07-05-200209-18-200206-04-2002
E16Airport Master Plan for South County Airport3-06-0229-03

$235,000

90%

09-14-1999
04-11-2001
09-18-2002
08-06-2001
04-10-2001
E16FAA approved (4/83) and BOS agreed (9/87) upon FAA payment of 1,215,000 for airport runway project improvements with the 1982 airports masterplan3-06-0229-02

$1,215,000

90%

 09-18-198709-01-1987
  3-06-0229-01     
        
E16Land Acquisition Parcel Nos. 822-13-37, 38, 43, 44, 45, 46, 47, 48, 49, 50, 51, 54, 55, 70, 71, 72, 77, 80, 82, 86, 102, 104 (250+/- acres) 

$2,050,000

 06-12-1970  
E161. Land Acquisition Parcel Nos. 13-37, 38, 43, 44, 45, 49, 50, 51, 52, 54, 70, 71, 72, 76, 77, 80, 81, 82, 85, 86, 87 (180+ Acres)
2. Land Acquisition Parcels Nos. 13-46, 47, 55, 68, 72 (70+/- acres, including clear zone & access at Southerly end)
 

$1,780,000

n/a

10-01-1968denied
05-23-1969
10-21-68
E16Land Acquisition 

$2,10,000

n/a

11-16-1967denied 04-25-1968 
E16Land Acquisition 

$1,942,000

n/a

04-03-1967pulled by BOS06-05-67
 

Airport

FAA Project Description

FAA Grant Number

Grant Amount

FAA Participation Percentage

Applicant Date

Award Date

BOS Action Date

PAO       
PAOThe FAA has extracted grant assurances for individual grants and created this new document Terms and Conditions of Accepting Airport Improvement Program Grants. This document will only be updated when a change to the terms occurs and it will no longer be necessary to submit it with each grant.
PAOPlanning Grant - Pavement Management3-06-0182-08

$57,000

95%

08-15-2011, X
07-01-2011, X
09-12-201105-10-2011 a, s
PAORehabilitate Access Road3-06-0182-07

$525,000

95%

 08-13-2007 
PAOSecurity enhancement (perimeter fence, gate, access control), design only; install weather reporting equipment (AWOS) and pilot controlled lighting.3-06-0182-06

$300,000

95%

07-13-200508-02-200503-22-2005
PAORehabilitate Access Road (Embarcadaro Road) and install security gate3-06-0182-05

$450,000

90%

06-23-200308-12-200304-29-2003
PAOConduct Masterplan Update3-06-0182-04

$135,000

90%

09-14-1999
05-23-2000
08-22-2000
08-06-2001
09-19-2000
PAOReconstruct/overlay apron (approx. 700,000 sq.ft.) including tiedown anchors and marking3-06-0182-03

$1,033,817

90%

09-14-199409-30-199404-21-1996
PAORunway/parallel taxiway overlay (approx. 280,000 sq.ft.); reconstruct/overlay apron (approx 100,000 sq.ft.) including tiedown anchors and marking; drainage improvements, apron security lighting; and security fencing (approx. 7,000 LF) including automatic drive gates3-06-0182-02

$1,200,000

90%

08-17-199309-21-199309-28-1993
PAOFAR 150 Noise Study3-06-0182-01

$85,230

90%

08-07-198708-30-198809-27-1988
PAOConstruct aircraft parking apron including tie-downs (220,000 sq ft)9-04-052-7006

$85,000

53.72%

08-15-196912-18-1969 ltr12-30-1969
PAOSite preparation; fill for Runway 12L/30R and dike construction. Construction of aircraft parking apron (approx. 130,000 sq.ft.), drainage and tie-downs including conformance to existing apron9-04-052-D905

$128,279

53.62%

07-15-196803-07-1969unknown
PAOConstruct Apron area (approx. 360,000 sq.ft.). Reconstruct and widen parallel taxiway with connecting taxiways and holding apron9-04-052-D602

$99,006

53.64%

05-02-196606-20-1966 
PAOInstallation of MI taxiway lights, relocation of remote control console from vault to control tower, installation of cable between existing beacon and vault, and installation of cable duct to service runway and wind cone lighting9-04-052-D804

$12,922

53.63%

03-11-196705-23-196805-27-1968
PAOConstruct levees, place site fill, and relocate discharge lines from existing storm drainage pumping plant9-04-032-D803

$121,284

53.63%

06-19-196712-26-196712-27-1967
PAOOverlay, mark and light (MIRL) runway (65' x 2500') including shoulder preparation and drainage; construct apron (approximately 205,000 sq. ft.); install airport beacon and tower; taxiway guidance signs, lighted wind cone, and vault9-04-052-D501

$64,461

53.96%

11-04-196310-14-196411-04-196

©2021 County of Santa Clara. All rights reserved.